 |
|  |
 |
|
|
I picked up the new x when i found out it had the 1st x.
Ill play it sometime but maps take at least 3 hours for a 3 year thing and theres lots of days when I would be needing money but above the required level to win so I would just let it play for a couple hours. It got boring.
My typical way of playing through most of the original maps were jack up the loan to 20k, spend most of all of it, raise entrance fees, make everything free, place lots of food courts and non coaster rides and food courts, all by july first year. Then let it set until i could pay off the 20k and build some more coasters.
It got lame. I've tried the icebergs map on the new x but i cant beat it I play with free rides and high enterance fees but with free enterance I'm screwed I dont kow hwo to play with ride costs only.
|
|
|  |
 |
|
|
i made a 38.65 intensity steel twister on that map
[This message has been edited by Chef (edited September 27, 2000).]
|
|
|  |
 |
|
|
No theres 2 Loopy landscapes comes with Corkscrew follies on the same disc tho.
And no it doesn't obliterate your ability to play the originals why would they do that?
|
|
|  |
All times are GMT. The time now is 05:13. Apolyton Time is 00:13. |
top of page
|
| archivepost |
|
Forum Rules:
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
|
HTML code is ON
vB code is ON
Smilies are ON
[IMG] code is ON
|
|
|
|
|
|